logtipo
Loading

Motion Capture with the Perception Neurom 2.0 suit

1 / 3
2 / 3
3 / 3

This project was carried out within the scope of the 3D module, it was made with the Autodesk 3ds Max program. It lasted 2 months. During the 1st month, the entire scenario (bridge and buildings) was modeled. During the 2nd month, the materialization, animation and rendering of the project were carried out.